Darwin System

Erection Instructions

Step 1 

•

Set the base jacks.

•

Mark the location of base jacks (or U-Head Jack)

•

Put base jacks on marked position and adjust height to the right length as the drawing.

Step 2 

•

Install the vertical and horizontal.

•

Level check.

•

Level and vertical structure.

Step 3

•

Install the Cross Handrail and Horizontal.

Step 4

•

Install the Catwalk and Staircase.

Step 5

•

Install the Aluminum Stair Frame.

•

Install the Toe Board.

Step 6

•

Install the Stair Corner Guard.