TABLA Modular Shoring System
Erection System
Erection of Infill Column
Erection of Infill Wall
Erection of Cantilever
Step 5 - Install edge mouthing shoes at the bottom of cantilever post. Then wockers push cantilever post to edge of slab. Edge mounting shoes sit on the edge of slab.
Release of Panel Decking
Nikken AES Scaffolding (Thailand) Co., Ltd.
100/15 Vongvanij Building, 12Ath Floor, Rama 9 Road, Huaykwang, Bangkok 10310, Thailand
Tel: 0-2645-1100-2
Fax: 0-2645-1103
Email: info@nikkenaes.com