--height spacing
Crab 60 Frame shoring
Erection Instructions
Step 1
• |
Place the base jack at distances determined by the horizontal members. |
• |
Wedge the first horizontal members. |
• |
Install basic standard. |
Step 2
• |
Lay the first Plan Brace. |
• |
Fit and lock the first stage of triangular. |
• |
Level and vertical structure. |
Step 3
• |
Install the second stage of triangles. Reverse the direction of the triangles. |
Step 4
• |
Install temporary working platform (Panacier) in the tower access. |
• |
Carefully check that the structure is connected using the sighting device present on all the triangle sleeves. |
• |
The upper and lower tubes should be in contact at each leg. |
Step 5
• |
Erection must be carried out from inside the towers. |
• |
Fit the second plan brace, reversed by comparison with the preceding ones. |